Commit Graph

6 Commits

Author SHA1 Message Date
zio
214b6df1ef feat(public,security,data): visitor public site + AI guide, security hardening, V42-V45 migrations
- frontend: visitor public home (AiAssistant, AiPlanningBriefing, VisitorTrackPage),
  3-track public routing (PublicShell/App), i18n ko/en/zh/ja, favicon
- backend: public AI visitor-assistant + event calendar API (publicsite/*),
  profile avatar API (auth/profile/*), SecurityConfig CORS whitelist,
  SecretStartupValidator (B12 fail-fast, prod only), application-prod.yml,
  AppIntegrity, /api/auth/me expansion (MeResponse)
- db: V42 bulk demo seed, V43 visitor_guide/transport + event calendar view,
  V44 performance indexes, V45 app_user profile photo columns (all idempotent)

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-12 19:05:00 +09:00
zio
433eb83a16 feat(ux,domain,data): checkpoint — search domain, approval WISE, calendar M/W/D, holidays 2050, dept org-tree, offcanvas, settings icon, V39 demo realism
- search: domain results (event/exhibition/company/auction/booth/lead/CMS) with routes; PII-safe
- approval WISE: compose + approval-line editor, reject flow, resubmit rejected, 4-tab inbox
- schedule: month/week/day views (WISE CalendarView), 50:50 split, day-number top, no bottom gap
- holidays: system-mgmt holiday admin + V41 KR holidays 2024~2050 (lunar+substitute),
  calendar red + holiday-name label; route/menu wired
- dept: WISE org-tree 2-pane
- shared Offcanvas component; hall-assign chip -> right slide-in detail
- top-bar settings icon; home 2-col bottom-aligned; analytics ?tab= deep-link; grid font
  unified to Nifty "Advanced table headers"; form width cap; 2-pane 50:50
- data V39: 3 ongoing exhibitions + rich closed-loop (e-2026-live) + demo-account event
  membership + demo OTP seed — resolves "everything goes home" / floorplan+gallery 403
- Nifty design-system learning doc + refs index; product name unified; new harnesses
  (wise-ui, renewal/testdata, benchmark/crawler, menu-ia)
- i18n: all pending keys merged, missing=0 (except in-progress 3-track keys)
- verified: tsc -b --force, vite build, compileJava, test all EXIT 0

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-12 17:44:30 +09:00
zio
5ddd7136a9 feat(ux,system,identity): waves 10-12 + renewal-1 — WISE shell (hamburger/accordion IA), system-mgmt basics (V37), email channel (V36), product identity, home AI hub, demo seed (V38), menu IA, app-QR, product rename
- W10 email: self-hosted Postfix channel (owner-approved) — auction-open contractor notice
  (in-app + email), EDM send (opt-in, cap 500), password-reset mail, mail_log (V36)
- W11 WISE shell: hamburger toggle, single-open accordion, 6-group IA restructure,
  system-mgmt group, KINTEX CI wordmark logo, home charts x3, responsive bottom user area,
  calendar alignment; fixed goScoped links (no /login bounce, hall parsing)
- W12 system-mgmt basics (UIWS parity): dept/company, program registry, role-menu map,
  auth policy, login history, error log, system health, mail/notify config (V37, 10 routes)
- product identity: public landing hero + role value cards + AI pipeline steps; login
  tagline; root gate (unauth -> /public product intro, auth -> /home)
- home AI hub: 5 AI tool cards + NL quick-ask strip (AI visibility)
- menu IA: 13 orphan routes folded in, system-mgmt 5 sub-sections, dead-links 0
- app-QR install page (/app-qr, WISE AppQrCode pattern); EAS build G3-approved
- product rename -> "KINTEX AI 전시·행사시스템" across 4 locales + title
- V38 demo closed-loop seed: codes/programs/depts/companies + booths/leads/approvals/
  invoices/notices, 4 demo accounts — activates home todos/KPIs
- new harnesses: wise-ui alignment (+menu-ia), full renewal (testdata), benchmark (analyst/crawler)
- SPA cache: index.html no-store (instant deploy reflection)
- verified: compileJava, test, tsc -b --force, vite build all EXIT 0

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-12 15:57:34 +09:00
zio
6c9891c7e2 feat: mobile harness + design v2.1 (84 screens) + PLANNING v3.1 + deliverables + Stitch screens
- Harness: kintex-mobile-dev agent + kintex-mobile-orchestrator skill (WISE mobile ref, Stitch-first design rule, dual app targets B2B/B2C)
- design.md v2.1: full 84-screen inventory (web 51 / admin 10 / public 8 / mobile 15) with Stitch prompts incl. ticketing (SCR-P7/P8, M14/M15)
- PLANNING v3.1: unified account + split signup tracks (2FA required for staff, light signup/guest for visitors), one codebase / two app targets
- Deliverables: dev plan (21s), user/operator/developer guides (17/14/15s), program spec (44s, 65 programs, 8 flowcharts), DA (DB design 14s + table spec xlsx 35 tables/299 cols)
- Benchmark: ticketing-app-benchmark.md (7 apps) -> IMPLEMENTATION_BACKLOG Phase F (14 items)
- Stitch: 23 generated screens saved (mobile 10, admin 6, web core 5, ticket 2)
- mobile/: Expo scaffold (SDK 51, expo-router, secure store JWT)
- frontend: SCR-13~17 QA fixes, icons.tsx, kintexEvents, V10 seed migration
- ci/: KINTEX CI logo assets

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-11 23:31:45 +09:00
zio
3da6b1c092 feat(harness): ReRoomAI 분석 반영 — PLANNING v1.1 나노바나나 파이프라인 확정 + client.py 재작성 + Stitch 전달
- docs/analysis/reroomai-source.md 신규: gemini-3.1-flash-image-preview image-to-image, 보존/교체 프롬프트, CompareSlider/전처리 차용
- PLANNING v1.1: §6-4/6-5 나노바나나 호출스택·부스 프롬프트 빌더 확정, R11 해소·R12(Gemini 외부API 승인 게이트) 추가
- tools/nanobanana/client.py 전면 재작성: build_booth_prompt 4단 조립, 메타데이터 임베드, S6 래스터 합성 분리, seed 폴백, 방어 로직
- BACKLOG B-02/B-03/B-09/B-11/B-12 done
- kintex.com 2차 검증 순증 사실 반영(기본부스 사양·이격·홀 스펙)

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 16:40:11 +09:00
zio
8a488322c1 chore: kintex 하네스 초기 커밋 (로컬 소스)
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 16:16:33 +09:00